Replacing Air Conditioner

Common Construction Projects

Replacing Air Conditioner

Instructions

Electrical

  1. Submit Electrical Subcode Technical Form completed.
  2. Provide manufacturer installation instructions and specification sheets.

Plumbing (Exception: Window Airconditioners)

  1. Provide manufacturer installation guide.  Indicate the model (minimum 13 SEER) that is to be installed.
  2. Submit Mechanical Subcode Technical Form. 
  3. Submit Plumbing Subcode Technical Form where condensate drain is required.

To Top

Application Forms

[In all cases of plumbing or electrical projects where a contractor is hired, EACH copy of the permit application must have the raised seal of the contractor.]

To Top

Inspections

Electrical

  1. Final Inspection:  All electrical equipment connected and ready for use.

Plumbing

  1. Final Inspection

To Top

Terms & Definitions

Plumbing

  1. Condensate: A gas that changes to liquid due to temperature change.

To Top

Fees

The state allows each municipality to adopt their own fee schedules based on the actual costs incurred.  The fee schedule is monitored annually by the New Jersey Department of Community Affairs to ensure the fees are not excessive and are adequate to cover appropriate costs.

The cost of a permit is set by township ordinance available at the township Construction Office.


For the successful completion of your project, in addition to general guidance and information in this section, The Construction Department reserves the right to ask for any specific information or clarification unique to your project.